Skip to content
Removal finished with air clearance testing Open 24/7 (516) 646-3288
Asbestos Removal Garden City logo

For projects inside New York City

ACP-5 Filing for Garden City Owners With City Projects

The space your project will touch is surveyed, and the asbestos assessment most city permit applications call for is prepared and signed by a certified DEP investigator.

Architectural drawings of a house

Who in Garden City Needs an ACP-5?

Garden City is in Nassau County, not New York City, so a project at a home or building in the village does not call for an ACP-5. Why offer it here, then? Because a good share of the people who live and work around Garden City own, manage or build in the five boroughs: a rented two-family in Queens, a Manhattan apartment gut job, a Brooklyn office floor under a manager's care. Those projects run under New York City rules, and asbestos there falls under the Department of Environmental Protection, which runs its own program. An ACP-5, the Asbestos Assessment Report, accompanies most Department of Buildings permit filings and states that the proposed work leaves regulated asbestos undisturbed. The signature has to come from a DEP-certified asbestos investigator, who first walks and inspects the space. What happens if the survey finds asbestos the work will disturb? Then the report cannot simply say there is none; a licensed contractor abates that material first, filed under a project notification. Asbestos Removal Garden City handles both paths. The survey is done, samples go to an accredited lab where needed, and the paperwork is prepared correctly so the permit application is not sent back. If abatement is required, the same team can scope and complete it, so you are not coordinating two outside firms on one city job.

What Comes With an ACP-5 Filing?

Everything needed to support the asbestos piece of a city permit application.

  • On-site survey

    Every room and material in the permit scope is examined by the certified investigator.

  • Sampling where required

    Anything questionable is sampled and sent for accredited lab analysis.

  • ACP-5 preparation

    The Asbestos Assessment Report is completed from the survey findings.

  • Certified signature

    The report is signed by the DEP-certified investigator who did the survey.

  • Filing support

    The completed report is ready to accompany your Department of Buildings application.

  • Clear findings

    You learn whether the work will disturb regulated asbestos before plans are finalized.

  • Abatement path if needed

    If asbestos must be disturbed, abatement is scoped and filed under a project notification.

  • One team for both

    Survey, report and any removal handled together, with no handoff between firms.

How Does the ACP-5 Process Run?

  1. Review the permit work

    Tell us the address, the scope on your plans and where the application stands. That defines the area the investigator must survey.

  2. Survey and sample

    Rooms in the scope are inspected and questionable materials are sampled for the lab.

  3. Report or abate

    Where no regulated asbestos is touched, the ACP-5 gets completed and signed. If it will be, abatement is planned and filed so the permit can proceed.

Why Contractors Hand Us Their ACP-5 Work

  • Paperwork done right the first time

    A complete, correctly signed report keeps an application from bouncing back.

  • Findings before surprises

    You know early whether abatement is needed, while plans can still adjust.

  • Removal under the same roof

    Should the survey turn up asbestos, our own crew takes on the abatement.

  • DEP-certified investigator
  • Accredited lab sampling
  • Correct, signed report
  • Abatement if required

Is the Asbestos Line Holding Up Your Permit?

Share the address, the scope and the status of the application, and we will tell you whether an ACP-5 fits or abatement has to happen first.